.. _method-bayes_calibration-gpmsa-proposal_covariance-derivatives-update_period: """"""""""""" update_period """"""""""""" Period at which to update derivative-based proposal covariance .. toctree:: :hidden: :maxdepth: 1 **Specification** - *Alias:* None - *Arguments:* INTEGER **Description** For derivative-based proposal covariance, this specifies the period (number of accepted MCMC samples) after which the proposal covariance is updated using derivative values at the current chain point. *Default Behavior* When ``update_period`` is not specified, derivatives will inform the proposal covariance at the start of the chain, but not updated further. *Usage Tips* The ``update_period`` should be tailored to the size of the total chain, accounting for the relative expense of derivative-based proposal updates. **Examples** .. code-block:: method, bayes_calibration queso samples = 2000 seed = 348 delayed_rejection emulator pce sparse_grid_level = 2 proposal_covariance derivatives update_period = 40 # update proposal covariance every 40 points